Contributions to Standardization
2014
  1. Requirements for management of Reverse Power Feeding systems, Les Humphrey (BT), Dave Thorne (BT), Broadband Forum contribution bbf2014.1154.01, December 2014.
  2. Rate Alignment Mechanism for DPU, Chris Croot (BT), Broadband Forum contribution bbf2014.1202.00, December 2014.
  3. Proposed G.fast YANG Model, Richard Goodson (ADTRAN), Peter Adams (ADTRAN), Nick Hancock (ADTRAN), Joey Boyd (ADTRAN), Broadband Forum contribution bbf2014.1251.01, December 2014.
  4. Intermediate Agent considerations, David Thorne (BT), Broadband Forum contribution bbf2014.1254.00, December 2014.
  5. Dying Gasp Code Requirements, David Thorne (BT), Les Humphrey (BT), Broadband Forum contribution bbf2014.1255.00, December 2014.
  6. DPU Forwarding Models, David Thorne (BT), Broadband Forum contribution bbf2014.1256.00, December 2014.
  7. Upstream policing reconsidered, David Thorne (BT), Broadband Forum contribution bbf2014.1257.00, December 2014.
  8. FTTdp DPU Multicast Requirements, David Thorne (BT), Broadband Forum contribution bbf2014.1260.00, December 2014.
  9. On DRRus report format to support queue fill and traffic arrival triggers for LPM state changes, Les Humphrey (BT), Ian Cooper (BT), ITU-T-SG15 contribution COM 15 – C 1053 to “G.fast”, November 2014.
  10. G.9700 Out of band noise requirements, Les Humphrey (BT), Trevor Morsman (BT), ITU-T-SG15 contribution COM 15 – C 1110 to “G.fast”, November 2014.
  11. On concurrence of the G.9701 reference model with proposals for cross-layer LPM control, Les Humphrey (BT), ITU-T-SG15 contribution 2014-10-Q4-024 to “G.fast”, October 2014.
  12. Immunity of VDSL2 to out of band interference from G.fast, Les Humphrey (BT), Anas Mohsin (BT), ITU-T-SG15 contribution 2014-10-Q4-027 to “G.fast”, October 2014.
  13. Hlog requirements, Ian Horsley (BT), Les Humphrey (BT), ITU-T-SG15 contribution 2014-10-Q4-028 to “G.fast”, October 2014.
  14. Draft Amendment 1 to Recommendation ITU-T G.9701 (2014), Les Humphrey (BT), ITU-T-SG15 contribution 2014-10-Q4-029 to “G.fast”, October 2014.
  15. G.994.1 for Frequency Division Multiplexing of G.fast and VDSL2, Fred Chu (ADTRAN), ITU-T-SG15 contribution 2014-10-Q4-030 to “G.fast”, October 2014.
  16. Bonding of multiple G.fast links, Martin Kuipers (ADTRAN), Tom Starr (AT&T), ITU-T-SG15 contribution 2014-10-Q4-031R1 to “G.fast”, October 2014.
  17. One box and Two box CPE solutions with Reverse Power Feeding, Les Humphrey (BT), ITU-T-SG15 contribution 2014-10-Q4-032 to “G.fast”, October 2014.
  18. On DRA policies, Les Humphrey (BT), ITU-T-SG15 contribution 2014-10-Q4-033 to “G.fast”, October 2014.
  19. Correction to Noise Mask PSD, Ian R. Cooper (BT Group plc), John Macdonald (BT Group plc), contribution ATTMTM6(14)000085R1, October 2014.
  20. One box and Two box CPE solutions with Reverse Power Feeding, Ian R. Cooper (BT Group plc), John Macdonald (BT Group plc), contribution ATTMTM6(14)000086, October 2014.
  21. On integration of RPF, ZT and Derived POTS management in the context of the BBF FTTdp management recommendations, Leslie Humphrey (BT Group plc), Ian R. Cooper (BT Group plc), contribution ATTMTM6(14)000087, October 2014.
  22. On BBF RPF and ZT Progress, Leslie Humphrey (BT Group plc), John Macdonald (BT Group plc), contribution ATTMTM6(14)000088, October 2014.
  23. Immunity of VDSL2 to out of band interference from G.fast, Leslie Humphrey (BT Group plc), contribution ATTMTM6(14)000089, October 2014.
  24. On Zero Touch OAM, Leslie Humphrey (BT Group plc), contribution ATTMTM6(14)000090, October 2014.
  25. Latest Version of RTS 101 548 (v1.2.1), John Macdonald (BT Group plc), contribution ATTMTM6(14)000094, October 2014.
  26. ITU-T Issues Lists, John Macdonald (BT Group plc), contribution ATTMTM6(14)000095, October 2014.
  27. Combining RPF and Derived POTS on In-Premise Wiring, Peter Adams (ADTRAN), contribution ATTMTM6(14)000102, October 2014.
  28. FTTdp Diagnostics Requirements, David Thorne (BT), Broadband Forum contribution bbf2014.1034.00, October 2014.
  29. FTTdp Line Test Requirements, David Thorne (BT), Broadband Forum contribution bbf2014.1035.00, October 2014.
  30. The Relationship between WT301 and TR-156 and TR-167, David Thorne (BT), Broadband Forum contribution bbf2014.1036.00, October 2014.
  31. Thoughts on Maximum Attainable Rate, David Thorne (BT), Les Humphrey (BT), Broadband Forum contribution bbf2014.1037.00, October 2014.
  32. FTTdp QoS – queues and queue mapping, David Thorne (BT), Broadband Forum contribution bbf2014.1038.00, October 2014.
  33. RPF in Battery Low Power Mode, Les Humphrey (BT), Broadband Forum contribution bbf2014.782.01, September 2014.
  34. On the development of PLOAM data models for FTTdp, Les Humphrey (BT), Broadband Forum contribution bbf2014.859.01, September 2014.
  35. On G.fast low power modes control and transceiver internal queues, Les Humphrey (BT), Broadband Forum contribution bbf2014.905.00, September 2014.
  36. On 7 plane functional modelling- Multi-plane reference model analysis, Les Humphrey (BT), Broadband Forum contribution bbf2014.920.01, September 2014.
  37. On Zero Touch OAM - Update, Les Humphrey (BT), Broadband Forum contribution bbf2014.924.00, September 2014.
  38. Management of Hybrid FTTdp Units, Chris Croot (BT), David Thorne (BT), Broadband Forum contribution bbf2014.840.00, September 2014.
  39. The Relationship Between WT-301 and TR-178, David Thorne (BT), Broadband Forum contribution bbf2014.602.01, September 2014.
  40. FTTdp Diagnostics Requirements, David Thorne (BT), Broadband Forum contribution bbf2014.603.01, September 2014.
  41. Reverse Power Feed in Low Power Mode, David Thorne (BT), Les Humphrey (BT), Broadband Forum contribution bbf2014.604.00, September 2014.
  42. FTTdp Diagnostics Requirements – counter aggregation, David Thorne (BT), Broadband Forum contribution bbf2014.605.01, September 2014.
  43. Further Considerations on FTTdp Quality of Service, David Thorne (BT), Broadband Forum contribution bbf2014.606.01, September 2014.
  44. DPU and RPF battery backup powering requirements, David Thorne (BT), Les Humphrey (BT), Broadband Forum contribution bbf2014.863.00, September 2014.
  45. LPM trigger granularity , David Thorne (BT), Les Humphrey (BT), Broadband Forum contribution bbf2014.865.00, September 2014.
  46. FTTdp Line Test Requirements, David Thorne (BT), Broadband Forum contribution bbf2014.866.00, September 2014.
  47. Management Architecture Security and Location Issues, David Thorne (BT), Chris Croot (BT), Broadband Forum contribution bbf2014.867.00, September 2014.
  48. G.ploam: PLOAM Capabilities for G.fast, Les Humphrey (BT), Ian Cooper (BT), ITU-T-SG15 contribution 2014-08-Q4-027 to “G.fast”, August 2014.
  49. Buffer and Queue Control for LPM, Les Humphrey (BT), Ian Cooper (BT), ITU-T-SG15 contribution 2014-08-Q4-032 to “G.fast”, August 2014.
  50. Frequency Division Multiplexing and Bonding G.fast and VDSL2, Richard Goodson (ADTRAN), ITU-T-SG15 contribution 2014-08-Q4-037 to “G.fast”, August 2014.
  51. Bonding and DRA for Frequency Division Multiplexing with VDSL2, Ken Ko (ADTRAN), ITU-T-SG15 contribution 2014-08-Q4-038 to “G.fast”, August 2014.
  52. G.994.1 for Frequency Division Multiplexing of G.fast and VDSL2, Fred Chu (ADTRAN), ITU-T-SG15 contribution 2014-08-Q4-039 to “G.fast”, August 2014.
  53. Proposal for Position of Initialization Symbols, Richard Goodson (ADTRAN), ITU-T-SG15 contribution 2014-08-Q4-040 to “G.fast”, August 2014.
  54. Draft Amendment 1 to Recommendation ITU-T G.9701 (2014), Les Humphrey (BT), ITU-T-SG15 contribution 2014-07-Q4-027R1 to “G.fast”, July 2014.
  55. Proposal for Position of Initialization Symbols, Martin Kuipers (ADTRAN), ITU-T-SG15 contribution 2014-07-Q4-028 to “G.fast”, July 2014.
  56. Noise characteristics for Autonomous Virtual Noise, Ian Horsley (BT), ITU-T-SG15 contribution 2014-07-Q4-029 to “G.fast”, July 2014.
  57. New Work Item on Reverse Power Feed (RPF), Martin Arndt (BT Group plc), contribution ATTMTM6(14)000036r6, July 2014.
  58. Requirements on Autonomous Virtual Noise, Ian Horsley (BT), ITU-T-SG15 contribution 2014-06-Q4-025 to “G.fast”, June 2014.
  59. Interference from PLC, Martin Kuipers (ADTRAN), ITU-T-SG15 contribution 2014-06-Q4-027 to “G.fast”, June 2014.
  60. O-P-SYNCHRO signals structure text fixes, Yevgeny Schnaiderman (Sckipio Technologies), Rami Verbin (Sckipio Technologies), ITU-T-SG15 contribution 2014-06-Q4-028R1 to “G.fast”, June 2014.
  61. SOC symbol repetitions reset various text fixes, Yevgeny Schnaiderman (Sckipio Technologies), Rami Verbin (Sckipio Technologies), ITU-T-SG15 contribution 2014-06-Q4-029R1 to “G.fast”, June 2014.
  62. On the scope and time-scale for G.9701 Amendment 2, Less Humphrey (BT), ITU-T-SG15 contribution 2014-06-Q4-040 to “G.fast”, June 2014.
  63. On Zero Touch OAM support in G.997.1, Less Humphrey (BT), ITU-T-SG15 contribution 2014-06-Q4-043 to “G.fast”, June 2014.
  64. BT requirements for Low Power Modes, and Rate-Reach, Less Humphrey (BT), ITU-T-SG15 contribution 2014-06-Q4-049 to “G.fast”, June 2014.
  65. On Low Power Mode Control Annex, Les Humphrey(BT), Less Humphrey (BT), ITU-T-SG15 contribution 2014-06-Q4-050R1 to “G.fast”, June 2014.
  66. On Zero Touch OAM, Les Humphrey (BT), Broadband Forum contribution bbf2014.301.01, June 2014.
  67. On G.fast low power modes control, Les Humphrey (BT), Broadband Forum contribution bbf2014.594.02, June 2014.
  68. Update on ETSI DTS 101 548 Approval, John MacDonald (BT Group plc), contribution ATTMTM6(14)000058R1, June 2014.
  69. Liaison to ITU-T Q4/15 on the RPF noise proposal, Pat O'Keeffe (EIRCOM), John MacDonald (BT Group plc), contribution ATTMTM6(14)000066, June 2014.
  70. Revised Draft of DTS 101 548 Following Comment Resolution, John MacDonald (BT Group plc), contribution ATTMTM6(14)000067, June 2014.
  71. FTTdp Management Architecture Proposal, Ken Ko (ADTRAN), Peter Adams (ADTRAN), Mike Shaffer (Alcatel-Lucent), Tom Starr (AT&T), Chris Croot (BT), Charles Cook (CenturyLink), Mauro Tilocca (Telecom Italia), Broadband Forum contribution bbf2014.401.02, May 2014.
  72. Reverse Powering Specification, Ian R. Cooper (BT Group plc), John Macdonald (BT Group plc), contribution ATTMTM6(14)000001R2, April 2014.
  73. Reverse Powering – Classes for Section 7, Ian R. Cooper (BT Group plc), John Macdonald (BT Group plc), François Fredricx (Alcatel-Lucent), Christophe Gendarme (Alcatel-Lucent), contribution ATTMTM6(14)46R1, April 2014.
  74. On standardisation of advanced UPBO methods for vectored G.fast, Les Humphrey (BT), ITU-T-SG15 contribution COM 15 – C 0664 – E to “G.fast”, March 2014.
  75. On the scope of G.fast Amendment 1, Les Humphrey (BT), ITU-T-SG15 contribution COM 15 – C 0665 – E to “G.fast”, March 2014.
  76. DTU's mapping and ACK bit-map structure (section 9.5), Rami Verbin (Sckipio Technologies), ITU-T-SG15 contribution COM 15 – C 0746– E to “G.fast”, March 2014.
  77. VDSL2 and G.FAST need a flexible protection mechanism against time varying noise, Les Humphrey (BT), Kevin Foster (BT), ITU-T-SG15 contribution COM 15 – C 0750– E to “G.fast”, March 2014.
  78. On Reverse Power Feeding system noise requirements, Les Humphrey (BT), ITU-T-SG15 contribution COM 15 – C 0772 – E to “G.fast”, March 2014.
  79. On extending G.997.1 to support PMA functionality, Les Humphrey (BT), ITU-T-SG15 contribution COM 15 – C 0773 – E to “G.fast”, March 2014.
  80. BT TAP comments on G.9700 (ex G.fast-PSD), Les Humphrey (BT), ITU-T-SG15 contribution COM 15 – C 0775 – E to “G.fast”, March 2014.
  81. Reference models for FTTdp, Les Humphrey (BT), Broadband Forum contribution bbf2014.255.00, March 2014.
  82. On G.fast test cables and pass-fail criteria for vectoring, Les Humphrey (BT), Broadband Forum contribution bbf2014.231.00, March 2014.
  83. The Selection of the Management Architecture for FTTdp, Peter Adams (ADTRAN), Richard Goodson (ADTRAN), Broadband Forum contribution bbf2014.246.01, March 2014.
  84. G.fast Low Power Mode Control, Les Humphrey (BT), Broadband Forum contribution bbf2014.268.00, March 2014.
  85. FTTdp Dying Gasp Requirements, David Thorne (BT), Chris Croot (BT), Broadband Forum contribution bbf2014.269.00, March 2014.
  86. FTTdp Zero Touch Requirements, David Thorne (BT), Chris Croot (BT), Les Humphrey (BT), Broadband Forum contribution bbf2014.270.00, March 2014.
  87. Proposed Liaison from BBF to CENELEC TC210 regarding impact of PLT on G.fast, Kevin T. Foster (BT), Trevor Morsman (BT), Les Humphrey (BT), Broadband Forum contribution bbf2014.271.00, March 2014.
  88. FTTdp Environmental Management Requirements, David Thorne (BT), Chris Croot (BT), Broadband Forum contribution bbf2014.272.00, March 2014.
  89. FTTdp DPU installation and commissioning, David Thorne (BT), Chris Croot (BT), Broadband Forum contribution bbf2014.273.00, March 2014.
  90. FTTdp Management Architecture Options, David Thorne (BT), Chris Croot (BT), Les Humphrey (BT), Broadband Forum contribution bbf2014.275.00, March 2014.
  91. Reverse Powering – Classes for Section 7, Ian Cooper (BT Group plc), John MacDonald (BT Group plc), contribution ATTMTM6(14)000033r1, March 2014.
  92. Liaison to EE on Publication process of EN 302 099, Pat O'Keeffe (EIRCOM), John Macdonald (BT Group plc), contribution ATTMTM6(14)000034, March 2014.
  93. An Enhancement for Combining RPF and POTS, Peter Adams (ADTRAN), Richard Goodson (ADTRAN), Dan Joffe(ADTRAN), contribution ATTMTM6(14)000038R1, March 2014.
  94. On Reverse Power Feed System noise, Les Humphrey (BT), ITU-T-SG15 contribution 2014-02-Q4-036 to “G.fast”, February 2014.
  95. Black Box Recorder for G.fast, Les Humphrey (BT), ITU-T-SG15 contribution 2014-02-Q4-037 to “G.fast”, February 2014.
  96. On the scope of G.fast Amendment 1, Les Humphrey (BT), ITU-T-SG15 contribution 2014-02-Q4-038 to “G.fast”, February 2014.
  97. Extension of G.997.1 to support G.fast PMA Requirements, Les Humphrey (BT), ITU-T-SG15 contribution 2014-02-Q4-039 to “G.fast”, February 2014.
  98. Impulse Noise Monitoring, Les Humphrey (BT), ITU-T-SG15 contribution 2014-02-Q4-040 to “G.fast”, February 2014.
  99. On Low Power Mode Control Annex Structure, Les Humphrey (BT), Ian Cooper (BT), ITU-T-SG15 contribution 2014-02-Q4-042R1 to “G.fast”, February 2014.
  100. On error monitoring for G.fast, Ian Horsley (BT), Les Humphrey (BT), ITU-T-SG15 contribution 2014-02-Q4-043 to “G.fast”, February 2014.
  101. On Reverse Power Feed System noise, Ian Cooper (BT Group plc), John MacDonald (BT Group plc), contribution ATTMTM6(14)000031, February 2014
  102. Reverse Powering – Safety Aspects, Ian Cooper (BT Group plc), Trevor Morsman (BT Group plc), John MacDonald (BT Group plc), contribution ATTMTM6(14)000020, January 2014.
  103. Changes to the Reverse Powering Specification, Peter Adams (ADTRAN), contribution ATTMTM6(14)000021R1, January 2014.
  104. Reverse Powering – Section 7, Ian Cooper (BT Group plc), John MacDonald (BT Group plc), contribution ATTMTM6(14)000022, January 2014.
  105. New Work Item for an Amendment of Reverse Power Feed TS, Ian Cooper (BT Group plc), John MacDonald (BT Group plc), contribution ATTMTM6(14)000023, January 2014.
2013
  1. On Electrical Requirements for G.fast, Les Humphrey (BT plc), ITU-T-SG15 contribution 2013-12-Q4-022 to “G.fast”, December 2013.
  2. Definition of DRRus, Martin Kuipers (ADTRAN), Richard Goodson (ADTRAN), Frank Van der Putten (Alcatel-Lucent Bell NV), ITU-T-SG15 contribution 2013-12-Q4-029 to “G.fast”, December 2013.
  3. Proposal to align notations in the PMD and PMS-TC sections, Vladimir Oksman (Lantiq), Massimo Sorbara (Ikanos), Rami Verbin (Sckipio Technologies), ITU-T-SG15 contribution 2013-12-Q4-036 to “G.fast”, December 2013.
  4. Upper bounds on the latency parameters, Rami Verbin (Sckipio Technologies), Chris Chang (Metanoia Technologies), Miguel Peeters (Broadcom), ITU-T-SG15 contribution 2013-12-Q4-038 to “G.fast”, December 2013.
  5. DTU size range, Rami Verbin (Sckipio Technologies), ITU-T-SG15 contribution 2013-12-Q4-039 to “G.fast”, December 2013.
  6. PMS-TC working text fixes, Rami Verbin (Sckipio Technologies), Vladimir Oksman (Lantiq), ITU-T-SG15 contribution 2013-12-Q4-043 to “G.fast”, December 2013.
  7. G.fast: Proposed Working Text Update on G.fast Profiles, Massimo Sorbara (Ikanos Communications), Vladimir Oksman (Lantiq), Miguel Peeters (Broadcom), Rami Verbin (Sckipio Technologies), ITU-T-SG15 contribution 2013-12-Q4-050R1 to “G.fast”, December 2013.
  8. G.fast: Proposed Text for Discontinuous Operation, Massimo Sorbara (Ikanos Communications), Vladimir Oksman (Lantiq), Rami Verbin (Sckipio Technologies), ITU-T-SG15 contribution 2013-12-Q4-053 to “G.fast”, December 2013.
  9. On noise budgets for Reverse Power Feeding systems for G.fast, Les Humphrey (BT plc), ITU-T-SG15 contribution 2013-12-Q4-059 to “G.fast”, December 2013.
  10. On impedance variation definitions, Rami Verbin (Sckipio Technologies), ITU-T-SG15 contribution 2013-12-Q4-062 to “G.fast”, December 2013.
  11. TPS-TC definitions, Les Humphrey (BT plc), Ian Horsley (BT plc), ITU-T-SG15 contribution 2013-12-Q4-063 to “G.fast”, December 2013.
  12. On retransmission buffers and their relation with bit-rate, Chris Chang (Metanoia Technologies), Rami Verbin (Sckipio Technologies), ITU-T-SG15 contribution 2013-12-Q4-064 to “G.fast”, December 2013.
  13. On DRA and Low Power Modes G.fast interface, Les Humphrey (BT plc), Ian Cooper (BT plc), ITU-T-SG15 contribution 2013-12-Q4-069 to “G.fast”, December 2013.
  14. DTU size range and ACK working text, Rami Verbin (Sckipio Technologies), ITU-T-SG15 contribution 2013-12-Q4-078 to “G.fast”, December 2013.
  15. Draft text on lpm control interface, Les Humphrey (BT plc), ITU-T-SG15 contribution 2013-12-Q4-082R2 to “G.fast”, December 2013.
  16. FTTdp Use Case Derived Requirements, David Thorne (BT), Broadband Forum contribution bbf2013.1269.01 , November 2013.
  17. G.Fast – FEXT measurements at a Radial Distribution Point, Les Humphrey (BT), Broadband Forum contribution bbf2013.1286.00 , November 2013.
  18. Management Architecture and Requirements for FttDP, Chris Croot (BT), Broadband Forum contribution bbf2013.460, November 2013.
  19. Defining Zero Touch OAM, Les Humphrey (BT), Broadband Forum contribution bbf2013.1223.00, November 2013.
  20. FTTdp noise erasure requirements, David Thorne (BT), Broadband Forum contribution bbf2013.1262.00, November 2013.
  21. FTTdp Diagnostics Requirements, David Thorne (BT), Les Humphrey (BT), Broadband Forum contribution bbf2013.1265.00, November 2013.
  22. Control of Low Power Modes in G.fast, Les Humphrey (BT), Broadband Forum contribution bbf2013.1266.00, November 2013.
  23. Use of TP-100 for In Premises Wiring, Les Humphrey (BT), Broadband Forum contribution bbf2013.1281.00, November 2013.
  24. Requirements on impulse noise protection capabilities, Bas van den Heuvel (TNO), Dennis François (KPN), Tom Starr (AT&T), Angus Carrick (Swisscom), Flavio Marigliano (Telecom Italia), Hubert Mariotte (Orange), Les Humphrey (BT plc), Marko Löffelholz (Deutche Telekom), ITU-T-SG15 contribution 2013-10-Q4-029 to “G.fast”, October 2013.
  25. Impact of Alien-Line Termination Changes on Vectoring Performance, Eduardo Medeiros (Lund University), Thomas Magesacher (Lund University), Per-Erik Eriksson (Ericsson), Chenguang Lu (Ericsson), Per Ödling (Lund University), Driton Statovci (FTW), ITU-T-SG15 contribution 2013-10-Q4-028 to “G.fast”, October 2013.
  26. On Low Power Mode Requirements, Les Humphrey (BT plc), ITU-T-SG15 contribution 2013-10-Q4-030 to “G.fast”, October 2013.
  27. On DRA and Low Power Modes – Continued, Les Humphrey (BT plc), Ian Cooper (BT plc), ITU-T-SG15 contribution 2013-10-Q4-066 to “G.fast”, October 2013.
  28. TPS-TC definitions, Les Humphrey (BT plc), Ian Horsley (BT plc), ITU-T-SG15 contribution 2013-10-Q4-068R1 to “G.fast”, October 2013.
  29. Reverse Powering Stable Draft, Ian R. Cooper (BT Group plc), John Macdonald (BT Group plc), ETSI TM6 contribution ATTMTM6(13)000109, October 2013.
  30. On Persistent Management Agent Requirements, Les Humphrey (BT Group plc), ETSI TM6 contribution ATTMTM6(13)000106, October 2013.
  31. On Zero Touch OAM, Les Humphrey (BT Group plc), ETSI TM6 contribution ATTMTM6(13)000105, October 2013.
  32. Further noise budgets for reverse power feeding system functional blocks, , Les Humphrey (BT Group plc), Ian R. Cooper (BT Group plc), ETSI TM6 contribution ATTMTM6(13)000104, October 2013.
  33. ITU-T Issues Lists, John Macdonald (BT Group plc), ETSI TM6 contribution ATTMTM6(13)0000101, October 2013.
  34. Text corrections for Bytes to bits padding, Rami Verbin (Sckipio Technologies), ITU-T-SG15 contribution 2013-03-Q4-065 to “G.fast”, October 2013.
  35. Upper limit on the value of Tg1’ – text correction, Rami Verbin (Sckipio Technologies), ITU-T-SG15 contribution 2013-03-Q4-067 to “G.fast”, October 2013.
  36. OLR proposals, Rami Verbin (Sckipio Technologies), Miguel Peeters (Broadcom), Vladimir Oksman (Lantiq), Dong WEI (Futurewei Technologies), ITU-T-SG15 contribution 2013-10-Q4-021R1 to “G.fast”, October 2013.
  37. On the need for a transmitter initiated OLR and multiple baseline tables, Rami Verbin (Sckipio Technologies), Vladimir Oksman (Lantiq), Chris Chang (Metanoia), ITU-T-SG15 contribution 2013-10-Q4-031 to “G.fast”, October 2013.
  38. OLR working text proposal for section 13, Rami Verbin (Sckipio Technologies), Vladimir Oksman (Lantiq), ITU-T-SG15 contribution 2013-10-Q4-032 to “G.fast”, October 2013.
  39. Initialization working text updates, Yevgeny Schnaiderman (Sckipio Technologies), Vladimir Oksman (Lantiq), ITU-T-SG15 contribution 2013-10-Q4-033 to “G.fast”, October 2013.
  40. RMC message size and format, Rami Verbin (Sckipio Technologies), ITU-T-SG15 contribution 2013-03-Q4-034R1 to “G.fast”, October 2013.
  41. DTUs re-synchronization after loss of RMC message, Guy Reina (Sckipio Technologies), ITU-T-SG15 contribution 2013-03-Q4-035 to “G.fast”, October 2013.
  42. DTU size range, Rami Verbin (Sckipio Technologies), ITU-T-SG15 contribution 2013-03-Q4-036 to “G.fast”, October 2013.
  43. On the randomization of zero-loaded carriers, Rami Verbin (Sckipio Technologies), ITU-T-SG15 contribution 2013-03-Q4-037R1 to “G.fast”, October 2013.
  44. OLR mechanism to modify RMC parameters, Rami Verbin (Sckipio Technologies), Vladimir Oksman (Lantiq), ITU-T-SG15 contribution 2013-10-Q4-070 to “G.fast”, October 2013.
  45. Management Architecture and Requirements for FttDP, Peter Adams (Adtran), Broadband Forum contribution bbf2012.1324.02 , October 2013.
  46. Impulse noise measurements: Examples of temporal and spectral behaviour, Bas van den Heuvel (TNO), Hans Segers (TNO), Jeroen Boschma (TNO), ITU-T-SG15 contribution 2013-09-Q4-034 to “G.fast”, September 2013.
  47. Updates of the working text describing early stages of initialization, Vladimir Oksman (Lantiq), Rami Verbin (Sckipio), Dong Wei (Futurewei), Miguel Peeters (Broadcom), Yevgeny Schnaiderman (Sckipio), ITU-T-SG15 contribution 2013-09-Q4-035R1 to “G.fast”, September 2013.
  48. Working text updates for late stages of Channel Discovery phase, Vladimir Oksman (Lantiq), Rami Verbin (Sckipio), Yevgeny Schnaiderman (Sckipio), ITU-T-SG15 contribution 2013-09-Q4-036 to “G.fast”, September 2013.
  49. Initial working text for Channel Analysis & Exchange phase, Vladimir Oksman (Lantiq), Rami Verbin (Sckipio), ITU-T-SG15 contribution 2013-09-Q4-037 to “G.fast”, September 2013.
  50. Noise limit requirements for reverse power feeding, Les Humphrey (BT plc), ITU-T-SG15 contribution 2013-09-Q4-055 to “G.fast”, September 2013.
  51. G.FAST: Protecting against fluctuating noise, Ian Horsley (BT plc), Les Humphrey (BT plc), ITU-T-SG15 contribution 2013-09-Q4-063 to “G.fast”, September 2013.
  52. RMC message structure, Rami Verbin (Sckipio Technologies), Dong Wei (Futurewei Technologies), ITU-T-SG15 contribution 2013-09-Q4-066 to “G.fast”, September 2013.
  53. Error Feedback Report Working Text Proposal, Rani Keren (Sckipio Technologies), Dong Wei (Futurewei Technologies), Vladimir Oksman (Lantiq), ITU-T-SG15 contribution 2013-09-Q4-067 to “G.fast”, September 2013.
  54. O-P-SYNCHRO signals structure modification, Yevgeny Schnaiderman (Sckipio Technologies), Rani Keren (Sckipio Technologies), Vladimir Oksman (Lantiq), ITU-T-SG15 contribution 2013-09-Q4-068 to “G.fast”, September 2013.
  55. Bytes to Bits padding - working text proposal, Guy Reina (Sckipio Technologies), Rami Verbin (Sckipio Technologies), ITU-T-SG15 contribution 2013-09-Q4-069 to “G.fast”, September 2013.
  56. Fast OLR behaviour under impulsive noise environment, Guy Reina (Sckipio Technologies), ITU-T-SG15 contribution 2013-09-Q4-070 to “G.fast”, September 2013.
  57. OLR on bit-loading table types, Rami Verbin (Sckipio Technologies), ITU-T-SG15 contribution 2013-09-Q4-071 to “G.fast”, September 2013.
  58. ACK grouping, Rami Verbin (Sckipio Technologies), ITU-T-SG15 contribution 2013-09-Q4-072 to “G.fast”, September 2013.
  59. Working text cleanup addressing few issues and editor notes, ITU-T-SG15 contribution 2013-09-Q4-073 to “G.fast”, September 2013.
  60. MELT for G.fast, Martin Kuipers (ADTRAN), ITU-T-SG15 contribution 2013-09-Q4-076 to “G.fast”, September 2013.
  61. OLR principles, Rami Verbin (Sckipio Technologies), Dong Wei (Futurewei Technologies), ITU-T-SG15 contribution 2013-09-Q4-077 to “G.fast”, September 2013.
  62. BT Comments on G.9700 G.fast PSD, Les Humphrey (BT plc), Trevor Morsman (BT plc), ITU-T-SG15 contribution 2013-09-Q4-080 to “G.fast”, September 2013.
  63. G.fast: On DBA and Low Power Modes, Les Humphrey (BT plc), Ian Cooper (BT plc), ITU-T-SG15 contribution 2013-09-Q4-085 to “G.fast”, September 2013.
  64. Operator positions on some framing matters, Les Humphrey (BT plc), Angus Carrick (Swisscom), Bas van den Heuvel (TNO), Flavio Marigliano (Telecom Italia), Hubert Marriotte (Orange), Marko Loeffelholz (DT), ITU-T-SG15 contribution 2013-09-Q4-088 to “G.fast”, September 2013.
  65. RMC working document, Rami Verbin (Sckipio Technologies), ITU-T-SG15 contribution 2013-09-Q4-089 to “G.fast”, September 2013.
  66. OLR principles, Rami Verbin (Sckipio Technologies), Dong Wei (Futurewei Technologies), ITU-T-SG15 contribution 2013-09-Q4-077 to “G.fast”, September 2013.
  67. Customer Self Install (CSI) BT perspectives, Les Humphrey (BT), Kevin Foster (BT), Broadband Forum contribution bbf2013.969.00, September 2013.
  68. Proposed Liaison to ETSI TM6 on Reverse Powering, Zero Touch OAM, and FTTdp Architecture and Use Cases, Les Humphrey (BT), Broadband Forum contribution bbf2013.1053.03, Sep. 2013.
  69. Proposed Liaison to ETSI TM6 on FTTdp use cases, Les Humphrey (BT), Broadband Forum contribution bbf2013.1054.00, September 2013.
  70. FTTdp QoS requirements, David Thorne (BT), Broadband Forum contribution bbf2013.657.01, September 2013.
  71. FTTdp and Multicast, David Thorne (BT), Broadband Forum contribution bbf2013.986.00, September 2013.
  72. FTTdp, pause frames and retransmission, David Thorne (BT), Broadband Forum contribution bbf2013.985.00, September 2013.
  73. FTTdp Use Case Summary and Analysis, David Thorne (BT), Broadband Forum contribution bbf2013.984.01, September 2013.
  74. High Level PMA Requirements, Christopher Croot (BT), Broadband Forum contribution bbf2013.919.01, September 2013.
  75. FTTdp: On modularity, Les Humphrey (BT), Broadband Forum contribution bbf2013.803.00, September 2013.
  76. FTTdp: On zero touch OAM, Les Humphrey (BT), Broadband Forum contribution bbf2013.825.00, September 2013.
  77. FTTdp: On reverse powering issues, Les Humphrey (BT), Broadband Forum contribution bbf2013.804.00, September 2013.
  78. Reverse power feed electrical reference model, John Macdonald (BT Group plc), ETSI TM6 contribution ATTMTM6(13)000088r1, August 2013.
  79. Reverse power feed electrical reference model, John Macdonald (BT Group plc), ETSI TM6 contribution ATTMTM6(13)000088, August 2013.
  80. Reverse Powering and POTS Signalling, Ian R. Cooper (BT Group plc), John Macdonald (BT Group plc), ETSI TM6 contribution ATTMTM6(13)000087, August 2013.
  81. Reverse Powering - Unintended Consequences, Ian R. Cooper (BT Group plc), John Macdonald (BT Group plc), ETSI TM6 contribution ATTMTM6(13)000083, August 2013.
  82. Reverse Powering - POTS Adapter Descriptions, Ian R. Cooper (BT Group plc), John Macdonald (BT Group plc), ETSI TM6 contribution ATTMTM6(13)000082, August 2013.
  83. Reverse Powering - Location versus Cardinality Descriptions, Ian R. Cooper (BT Group plc), John Macdonald (BT Group plc), ETSI TM6 contribution ATTMTM6(13)000080, August 2013.
  84. DRA Timing Requirements, Richard Goodson (ADTRAN), ITU-T-SG15 contribution C-0242 to “G.fast”, July 2013.
  85. Scrambler working text, Rami Verbin (Sckipio Technologies), Vladimir Oksman (Lantiq Deutschland GmbH), ITU-T-SG15 contribution C-0280 to “G.fast”, July 2013.
  86. TDD-frame and super-frame structure working text, Rami Verbin (Sckipio Technologies), ITU-T-SG15 contribution C-0286 to “G.fast”, July 2013.
  87. Robust OLR protocol, Guy Reina (Sckipio Technologies), ITU-T-SG15 contribution C-0303 to “G.fast”, July 2013.
  88. Fast OLR behaviour under impulsive noise environment, Guy Reina (Sckipio Technologies), ITU-T-SG15 contribution C-0304 to “G.fast”, July 2013.
  89. DTUs acknowledgment working text, Rami Verbin (Sckipio Technologies), ITU-T-SG15 contribution C-0305 to “G.fast”, July 2013.
  90. Proposal for Representation of Reported Error Samples, Rami Verbin (Sckipio Technologies), Rani Keren (Sckipio Technologies), ITU-T-SG15 contribution C-0306 to “G.fast”, July 2013.
  91. Proposal for discontinuous operation, Rami Verbin (Sckipio Technologies), ITU-T-SG15 contribution C-0307 to “G.fast”, July 2013.
  92. Update of the working text for PMS-TC section, Vladimir Oksman (Lantiq Deutschland GmbH), Rami Verbin (Sckipio Technologies), ITU-T-SG15 contribution C-0333 to “G.fast”, July 2013.
  93. Proposal for early stages of initialization, Rami Verbin (Sckipio Technologies), Vladimir Oksman (Lantiq), ITU-T-SG15 contribution C-0337 to “G.fast”, July 2013.
  94. Alternative samples report by FTU-R for downstream crosstalk estimation, Rami Verbin (Sckipio Technologies), Rani Keren (Sckipio Technologies), ITU-T-SG15 contribution C-0378 to “G.fast”, July 2013.
  95. Low Power Mode Requirements for G.FAST, Les Humphrey (BT), Ian Cooper (BT), ITU-T-SG15 contribution C-0413 to “G.fast”, July 2013.
  96. Discontinuous operation is not always the way to minimize power, Rami Verbin (Sckipio Technologies), ITU-T-SG15 contribution C-0419 to “G.fast”, July 2013.
  97. On VHF background noise assumptions for G.FAST, Les Humphrey (BT), ITU-T-SG15 contribution C-0431R1 to “G.fast”, July 2013.
  98. On Power Budget, Les Humphrey (BT), Ian Cooper (BT), ITU-T-SG15 contribution C-0434 to “G.fast”, July 2013.
  99. On Aggregate Transmitter Power, Les Humphrey (BT), ITU-T-SG15 contribution C-0436 to “G.fast”, July 2013.
  100. Proposal for improvements to draft text for G.fast-psd, Trevor Morsman (BT),Les Humphrey (BT), ITU-T-SG15 contribution C-0439 to “G.fast”, July 2013.
  101. FTTdp migration issues - multi-box options, David Thorne (BT), Broadband Forum contribution bbf2013.655.00, July 2013.
  102. On FTTdp Power Budgets, Les Humphrey (BT), Broadband Forum contribution bbf2013.630.00, July 2013.
  103. Reverse Power Feed TS, Ian R. Cooper (BT Group plc), John Macdonald (BT Group plc), ETSI TM6 contribution ATTMTM6(13)000071r2, June 2013.
  104. 1-Part RPF Edit, Ian R. Cooper (BT Group plc), John Macdonald (BT Group plc), ETSI TM6 contribution ATTMTM6(13)000070, June 2013.
  105. FTTdP Use-Cases, Les Humphrey (BT Group plc), ETSI TM6 contribution ATTMTM6(13)00069, June 2013.
  106. Management Architecture for FTTdp, Peter Adams (Adtran), Broadband Forum contribution bbf2013.527.01, Jun. 2013.
  107. FTTdp for customers who refuse the standard FTTP install, David Thorne (BT), Broadband Forum contribution bbf2013.654.00, June 2013.
  108. FTTdp in sparse rural areas, David Thorne (BT), Broadband Forum contribution bbf2013.644.00, June 2013.
  109. FTTdp to provide a self-install, fibre-rate service, David Thorne (BT), Broadband Forum contribution bbf2013.653.00, June 2013.
  110. FTTdp over directly buried drop wires, David Thorne (BT), Broadband Forum contribution bbf2013.652.00, June 2013.
  111. FTTdp for VDSL Cabinet Offload Use Case, David Thorne (BT), Broadband Forum contribution bbf2013.651.00, June 2013.
  112. FTTdp as a competitive, high-speed overlay Use Case, David Thorne (BT), Broadband Forum contribution bbf2013.649.00, June 2013.
  113. FTTdp in VDSL blackspots Use Case, David Thorne (BT), Broadband Forum contribution bbf2013.648.00, June 2013.
  114. FTTdp on exchange-only lines Use Case, David Thorne (BT), Broadband Forum contribution bbf2013.647.00, June 2013.
  115. FTTdp infill in a VDSL deployment area, David Thorne (BT), Broadband Forum contribution bbf2013.646.00, June 2013.
  116. Robust OLR protocol, Rami Verbin (Sckipio Technologies), ITU-T-SG15 contribution 2013-05-Q4-042 to “G.fast”, May 2013.
  117. On the need for a Fast OLR mechanism, Rami Verbin (Sckipio Technologies), ITU-T-SG15 contribution 2013-05-Q4-043 to “G.fast”, May 2013.
  118. Proposal to use TCM for RMC transmissions, Rami Verbin (Sckipio Technologies), ITU-T-SG15 contribution 2013-05-Q4-044 to “G.fast”, May 2013
  119. On FTTdp Power Budgets, Les Humphrey (BT), Broadband Forum contribution bbf2013.630.00, July 2013.ibution 2013-05-Q4-044 to “G.fast”, May 2013.
  120. On the need for complex FEQ gain correction message, Rami Verbin (Sckipio Technologies), ITU-T-SG15 contribution 2013-05-Q4-045 to “G.fast”, May 2013.
  121. RMC proposal RRC data format, Rami Verbin (Sckipio Technologies), ITU-T-SG15 contribution 2013-05-Q4-046 to “G.fast”, May 2013.
  122. RMC proposal discontinuous mode support, Rami Verbin (Sckipio Technologies), ITU-T-SG15 contribution 2013-05-Q4-047 to “G.fast”, May 2013.
  123. RMC framing and encoding proposals, Rami Verbin (Sckipio Technologies), Miguel Peeters (Broadcom), Chris Chang (Metanoia Technologies), ITU-T-SG15 contribution 2013-05-Q4-048 to “G.fast”, May 2013.
  124. The Need For Virtual Noise, Les Humphrey (BT), ITU-T-SG15 contribution 2013-05-Q4-063 to “G.fast”, May 2013.
  125. Micro Interruptions, Les Humphrey (BT), ITU-T-SG15 contribution 2013-05-Q4-067 to “G.fast”, May 2013.
  126. BT cable loss measurements, Anas Mohsin (BT), ITU-T-SG15 contribution 2013-05-Q4-036 to “G.fast”, May 2013.
  127. G.fast: Regulatory Recommendation, Les Humphrey (BT), ITU-T-SG15 contribution 2013-05-Q4-039 to “G.fast”, May 2013.
  128. Low Power Modes and Battery Life-Line, Les Humphrey (BT), ITU-T-SG15 contribution 2013-05-Q4-041 to “G.fast”, May 2013.
  129. Non-Vectored Versus Vectored Low Power Modes, Les Humphrey (BT), ITU-T-SG15 contribution 2013-05-Q4-062 to “G.fast”, May 2013.
  130. G.fast: Flexible Start Frequencies and PSD Shaping, Fred Chu (ADTRAN), ITU-T-SG15 contribution 2013-05-Q4-069 to “G.fast”, May 2013. 
  131. Parametric two-port models for reference loops, Heuvel (TNO), Brink (TNO), Humphrey (BT), Starr (AT&T), Cederholm (Ericsson), Broadband Forum contribution bbf2013.492, May 2013.
  132. FTTdp infill in a VDSL deployment area, David Thorne (BT), Broadband Forum contribution bbf2013.646.00, May 2013.
  133. Reverse Powering Reference Model Figure 2, Ian R. Cooper (BT Group plc), John Macdonald (BT Group plc), ETSI TM6 contribution ATTMTM6(13)000070, April 2013.
  134. Reverse Powering Updated Reference Models, Ian R. Cooper (BT Group plc), John Macdonald (BT Group plc), ETSI TM6 contribution ATTMTM6(13)000047, April 2013.
  135. ITU-T Issues Lists, John Macdonald (BT Group plc), ETSI TM6 contribution ATTMTM6(13)000044, April 2013.
  136. Report from Reverse Power Audio 28th February 2013, John Macdonald (BT Group plc), ETSI TM6 contribution ATTMTM6(13)000043, April 2013.
  137. Reverse Power Feed Scenarios Proposed Text, Ian R. Cooper (BT Group plc), John Macdonald (BT Group plc), ETSI TM6 contribution ATTMTM6(13)000035r1, March 2013.
  138. G.fast: Release of measured transfer characteristics of the 104m KPN access cable, Bas van den Heuvel, Peter Trommelen, Rob F.M. van den Brink (TNO), ITU-T-SG15 contribution 2013-03-Q4-025, March 2013.
  139. G.fast: Preliminary analysis of the transfer characteristics of the 104 m KPN Access cable, Bas van den Heuvel, Peter Trommelen, Rob F.M. van den Brink (TNO), ITU-T-SG15 contribution 2013-03-Q4-026, March 2013.
  140. G.fast: Vectoring gain limitations due to changing terminations of alien wire pairs, Jeroen Boschma, Bas van den Heuvel (TNO), ITU-T-SG15 contribution 2013-03-Q4-044, March 2013.
  141. G.fast: On Vectoring, Les Humphrey (BT), ITU-T-SG15 contribution 2013-03-Q4-075 to “G.fast”, March 2013.
  142. Release of measured transfer characteristics of the 104m KPN access cable, Bas van den Heuvel (TNO), ITU-T-SG15 contribution 2013-03-Q4-025 to “G.fast”, March 2013.
  143. Preliminary analysis of the transfer characteristics of the 104 m KPN Access cable, Bas van den Heuvel (TNO), ITU-T-SG15 contribution 2013-03-Q4-026 to “G.fast”, March 2013.
  144. G.fast: Definition of DRR and TXOP Interfaces, Fred Chu (ADTRAN), ITU-T-SG15 contribution 2013-03-Q4-030 to “G.fast”, March 2013.
  145. Vectoring gain limitations due to changing terminations of alien wire pairs, Bas van den Heuvel (TNO), ITU-T-SG15 contribution 2013-03-Q4-044 to “G.fast”, March 2013.
  146.  Fast OLR proposal for G.fast, Rami Verbin (Sckipio Technologies), ITU-T-SG15 contribution 2013-03-Q4-059 to “G.fast”, March 2013.
  147. Vectoring performance analysis Swisscom binder, Rami Verbin (Sckipio Technologies), Rani Keren (Sckipio Technologies), ITU-T-SG15 contribution 2013-03-Q4-060 to “G.fast”, March 2013.
  148. Downlink RMC symbol position and uplink latency analysis, Rami Verbin (Sckipio Technologies), ITU-T-SG15 contribution 2013-03-Q4-061 to “G.fast”, March 2013.
  149. Precoder scheme way forward, Rami Verbin (Sckipio Technologies), ITU-T-SG15 contribution 2013-03-Q4-062 to “G.fast”, March 2013.
  150. RMC transmission method, Guy Reina (Sckipio Technologies), ITU-T-SG15 contribution 2013-03-Q4-063 to “G.fast”, March 2013.
  151. Proposal for QAM-8 constellation, Liam Alfandary (Sckipio Technologies), ITU-T-SG15 contribution 2013-03-Q4-068 to “G.fast”, March 2013.
  152. DTU to TDD-frames mapping (non-integer DTUs/frame), Rami Verbin (Sckipio Technologies), ITU-T-SG15 contribution 2013-03-Q4-071 to “G.fast”, March 2013.
  153. Low Power Modes – Continued, Les Humphrey (BT), ITU-T-SG15 contribution 2013-03-Q4-067 to “G.fast”, March 2013.
  154. G.fast: Consent contingency plan, Les Humphrey (BT), ITU-T-SG15 contribution 2013-03-Q4-073 to “G.fast”, March 2013.
  155. High Frequency xtalk data, Les Humphrey (BT), Broadband Forum contribution bbf2013.227.00 , March 2013.

  156. FTTdp Use Case Template Proposal, David Thorne (BT), Broadband Forum contribution bbf2013.395.01, March 2013.
  157. FTTdp Quality of Service, David Thorne (BT), Broadband Forum contribution bbf2013.270.00, March 2013.
  158. FTTdp Use Cases, David Thorne (BT), Broadband Forum contribution bbf2013.280.00, March 2013.
  159. FTTdp: FAST Low Power Modes, Les Humphrey (BT), Broadband Forum contribution bbf2013.247.00, March 2013.
  160. Fttdp: DPU Modularity and BT Requirements, Les Humphrey (BT), Broadband Forum contribution bbf2013.141.00, March 2013.
  161. FTTdp Architecture Issues, David Thorne (BT), Broadband Forum contribution bbf2012.1435.01, March 2013.
  162. FTTdp and Voice Support, David Thorne (BT), Broadband Forum contribution bbf2012.1434.01, March 2013.
  163. Reverse Power Feed State Machine for Startup Process, Ian R. Cooper (BT Group plc), John Macdonald (BT Group plc), ETSI TM6 contribution ATTMTM6(13)000037, February 2013.
  164. Part 2 Reference Model - Update Text, Ian R. Cooper (BT Group plc), John Macdonald (BT Group plc), ETSI TM6 contribution ATTMTM6(13)000036, February 2013. 
  165. Reverse Power Feed Scenarios Proposed Text, Ian R. Cooper (BT Group plc), John Macdonald (BT Group plc), ETSI TM6 contribution ATTMTM6(13)000035, February 2013.
  166. Electrical Reference Model, John Macdonald (BT Group plc), ETSI TM6 contribution ATTMTM6(13)000030r1, February 2013. 
  167. Hardware architectures optimised for zero touch OAM and RPF, Ian R. Cooper (BT Group plc), John Macdonald (BT Group plc), ETSI TM6 contribution ATTMTM6(13)000027, February 2013. 
  168. ITU-T Issues Lists, John Macdonald (BT Group plc), ETSI TM6 contribution ATTMTM6(13)000022, February 2013.
  169. Report from FTTdp Audio Conference 18th December 2012, John Macdonald (BT Group plc), ETSI TM6 contribution ATTMTM6(13)000016, February 2013.
  170. Next steps for the development of WT-318, Peter Adams (Adtran), Broadband Forum contribution bbf2013.190.00, February 2013.
  171. FTTdp use cases for France Telecom Orange, Hubert Mariotte (FTO), ITU-T-SG15 contribution 2013-01-Q4-024 to “G.fast”, January 2013.
  172. Low power modes, Les Humphrey (BT), ITU-T-SG15 contribution 2013-01-Q4-045 to “G.fast”, January 2013.
  173. The Power Management Entity (PME), Ron Sterenson (Sckipio Technologies), Martin Kuipers (ADTRAN), ITU-T-SG15 contribution 2013-01-Q4-049R3 to “G.fast”, January 2013.
  174. Latency requirement and TDD frame size for G.fast in mobile backhaul application, Per-Erik Eriksson (EAB), ITU-T-SG15 contribution 2013-01-Q4-055 to “G.fast”, January 2013.
  175. G.fast: Definitions for low-power modes – Extended, Les Humphrey (BT), ITU-T-SG15 contribution 2013-01-Q4-062 to “G.fast”, January 2013.
  176. DPU Dimensioning, Les Humphrey (BT), ITU-T-SG15 contribution 2013-01-Q4-063R2 to “G.fast”, January 2013.
  177. On notching for G.fast, Les Humphrey (BT), ITU-T-SG15 contribution 2013-01-Q4-064 to “G.fast”, January 2013.
  178. G.fast VHF Cable Model and FEXT, ITU-T-SG15 contribution 2013-01-Q4-065 to “G.fast”, January 2013.
  179. G.fast: Release of BT cable measurements for use in simulations, Les Humphrey (BT), ITU-T-SG15 contribution 2013-01-Q4-066 to “G.fast”, January 2013.
  180. Liaison to BBF on Development of MIMO Channel Model for G.fast, Les Humphrey (BT), ITU-T-SG15 contribution 2013-01-Q4-070R1 to “G.fast”, January 2013.
  181. Draft liaison to the Broadband Forum regarding fast retrain for G.FAST, Les Humphrey (BT), Massimo Sorbara (Ikanos Communications Inc), ITU-T-SG15 contribution 2013-01-Q4-071R1 to “G.fast”, January 2013.
  182. Loop timing in G.fast, Vladimir Oksman (Lantiq), Massimo Sorbara (Ikanos ), Miguel Peeters (Broadcom ), Rami Verbin (Sckipio Technologies), ITU-T-SG15 contribution 2013-01-Q4-061R1 to “G.fast”, January 2013.
  183. Channel estimation method for G.fast, Vladimir Oksman (Lantiq), Rami Verbin (Sckipio Technologies), Rainer Strobel (Lantiq), Rani Keren (Sckipio Technologies), ), ITU-T-SG15 contribution 2013-01-Q4-039 to “G.fast”, January 2013.
  184. The need for CRC protection per DTU, Rami Verbin (Sckipio Technologies), ITU-T-SG15 contribution 2013-01-Q4-047 to “G.fast”, January 2013.
  185. Definitions for low-power modes, Rami Verbin (Sckipio Technologies), Vladimir Oksman (Lantiq), Mingming Cheng (ZTE CORPORATION), Martin Kuipers (Adtran), ITU-T-SG15 contribution 2013-01-Q4-048 to “G.fast”, January 2013.
  186. Requirements for the robust management channel (RMC), Guy Reina (Sckipio Technologies), ITU-T-SG15 contribution 2013-01-Q4-050 to “G.fast”, January 2013.
  187. Vectoring performance analysis, Rami Verbin (Sckipio Technologies), Rani Keren (Sckipio Technologies), ITU-T-SG15 contribution 2013-01-Q4-051 to “G.fast”, January 2013.
  188. Hybrid precoder scheme, Rami Verbin (Sckipio Technologies), ITU-T-SG15 contribution 2013-01-Q4-052 to “G.fast”, January 2013.
  189. ZF precoder performance over larger binders, Rami Verbin (Sckipio Technologies), ITU-T-SG15 contribution 2013-01-Q4-054 to “G.fast”, January 2013.
2012
  1. Release of interpolated TNO cable measurements, Bas van den Heuvel (TNO), ITU-T-SG15 contribution 2012-11-4A-022 to “G.fast”, November 2012.
  2. Is G.fast deployable in Amsterdam?, Bas van den Heuvel (TNO), ITU-T-SG15 contribution 2012-11-4A-023 to “G.fast”, November 2012.
  3. KPN requirements for G.fast, Bas van den Heuvel (TNO), ITU-T-SG15 contribution 2012-11-4A-024 to “G.fast”, November 2012.
  4. On TDD Frame Size and Cyclic Extension, Les Humphrey (BT), ITU-T-SG15 contribution 2012-11-4A-033 to “G.fast”, November 2012.
  5. Release of BT cable measurements for use in simulations, Trevor Morsman (BT), ITU-T-SG15 contribution 2012-11-4A-034 to “G.fast”, November 2012.
  6. On FEXT Loss, Les Humphrey (BT), ITU-T-SG15 contribution 2012-11-4A-062 to “G.fast”, November 2012.
  7. On concatenating GPON DBA and G.fast, Les Humphrey (BT), ITU-T-SG15 contribution 2012-11-4A-067 to “G.fast”, November 2012.
  8. G.fast: Allocation of Downstream and Upstream Transmit Opportunities, Fred Chu (ADTRAN), ITU-T-SG15 contribution 2012-07-4A-021 to “G.fast”, July 2012.
  9. Indoor Phone Line Impulsive Noise Characteristics up to 125 MHz, Hubert Mariotte (FTO), ITU-T-SG15 contribution 2012-07-4A-022 to “G.fast”, July 2012.
  10. On RTX Requirements, Les Humphrey (BT), ITU-T-SG15 contribution 2012-07-4A-023 to “G.fast”, July 2012.
  11. Impulsive Noise Characteristics, Trevor Morsman (BT), ITU-T-SG15 contribution 2012-07-4A-024 to “G.fast”, July 2012.
  12. Low Power Modes for G.fast, Ian Cooper (BT), Les Humphrey (BT), ITU-T-SG15 contribution 2012-07-4A-026 to “G.fast”, July 2012.
  13. On the G.fast functional model, Les Humphrey (BT), ITU-T-SG15 contribution 2012-07-4A-043 to “G.fast”, July 2012.
  14. Advantages of using tone spacing of 124.3125kHz, Vladimir Oksman (Lantiq), Rami Verbin (Sckipio Technologies), Fred Chu (ADTRAN), Chris Chang (Metanoia), Agustin Badenes (Marvell Semiconductors Inc), ITU-T-SG15 contribution 2012-07-4A-045 to “G.fast”, July 2012.
  15. Update on FEC simulation results following the discussions in the May conference call, Agustin Badenes (Marvell Semiconductor Inc), ITU-T-SG15 contribution 2012-07-4A-046R1 to “G.fast”, July 2012.
  16. A TDD frame structure for small UD/DS guard time, Les Humphrey (BT), ITU-T-SG15 contribution 2012-07-4A-048 to “G.fast”, July 2012.
  17. On OLR, Les Humphrey (BT), ITU-T-SG15 contribution 2012-07-4A-049 to “G.fast”, July 2012.
  18. X/GPON DBA Primer, Richard Goodson (ADTRAN), ITU-T-SG15 contribution 2012-07-4A-050 to “G.fast”, July 2012.
  19. Specification of the wire pair models T05b and T05h, Bas van den Heuvel (TNO), ITU-T-SG15 contribution 2012-06-4A-036 to “G.fast”, June 2012.
  20. The in-premises wiring topology H6-NL, Bas van den Heuvel (TNO), ITU-T-SG15 contribution 2012-06-4A-037 to “G.fast”, June 2012.
  21. KPN requirements for G.fast, Rob van den Brink (TNO), Bas van den Heuvel (TNO), Dennis Francois (KPN), Bob Hoefnagel (KPN), ITU-T-SG15 contribution 2012-06-4A-039 to “G.fast”, June 2012.
  22. G.fast: FEXT anomalies, Les Humphrey (BT), ITU-T-SG15 contribution 2012-05-4A-046 to “G.fast”, June 2012.
  23. Reference Model Zero Touch and Powering aspects, Les Humphrey (BT), ITU-T-SG15 contribution 2012-05-4A-051 to “G.fast”, June 2012.
  24. On phantom modes, Les Humphrey (BT), ITU-T-SG15 contribution 2012-05-4A-060 to “G.fast”, June 2012.
  25. A flexible framing structure, Richard Goodson (ADTRAN), ITU-T-SG15 contribution 2012-05-4A-061 to “G.fast”, June 2012.
  26. FTTdp Architecture Proposal, Richard Goodson (ADTRAN), ITU-T-SG15 contribution 2012-05-4A-062 to “G.fast”, June 2012.
  27. G.fast: Management levels & framing structure, Marcos Martinez (Marvell Semiconductors Inc), ITU-T-SG15 contribution 2012-05-4A-063 to “G.fast”, June 2012.
  28. FEC simulation results following the discussions in the May conference call, Agustin Badenes (Marvell Semiconductors Inc), ITU-T-SG15 contribution 2012-05-4A-066 to “G.fast”, June 2012.
  29. On reference simulation conditions and FEC evaluation criteria (update), Agustin Badenes (Marvell Semiconductors Inc), ITU-T-SG15 contribution 2012-05-4A-067 to “G.fast”, June 2012.
  30. On dual slope FEXT observations, Les Humphrey (BT), ITU-T-SG15 contribution 2012-05-4A-021 to “G.fast”, May 2012.
  31. On statistical over subscription of modem resources, Les Humphrey (BT), ITU-T-SG15 contribution 2012-05-4A-022R2 to “G.fast”, May 2012.
  32. G.fast system impedance selection, Per-Erik Eriksson (EAB), ITU-T-SG15 contribution 2012-05-4A-023 to “G.fast”, May 2012.
  33. Comparison between measurements of unrolled cables and cables winded on drums, Per-Erik Eriksson (EAB), ITU-T-SG15 contribution 2012-05-4A-024R1 to “G.fast”, May 2012.
  34. G.fast: FEXT cable measurements, Les Humphrey (BT), ITU-T-SG15 contribution 2012-05-4A-025 to “G.fast”, May 2012.
  35. Multi-operators requirements for G.fast, Mauro Tilocca (Telecom Italia), Flavio Marigliano (Telecom Italia), Tom Starr (AT&T), Hubert Mariotte (FTO), Julien Guy (FTO), Daniel Tjernberg (TeliaSonera), Wang Bo (China Telecom), Gerald Clerckx (Telekom Austria), ITU-T-SG15 contribution 2012-05-4A-033 to “G.fast”, May 2012.
  36. Power dissipation requirements, Les Humphrey (BT), ITU-T-SG15 contribution 2012-05-4A-036 to “G.fast”, May 2012.
  37. Hardware architectures optimised for zero touch OAM, Les Humphrey (BT), ITU-T-SG15 contribution 2012-05-4A-037 to “G.fast”, May 2012.
  38. On Scalable Power Consumption, Les Humphrey (BT), ITU-T-SG15 contribution 2012-05-4A-038 to “G.fast”, May 2012.
  39. Updated BT Requirements for G.fast, Les Humphrey (BT), ITU-T-SG15 contribution 2012-05-4A-044 to “G.fast”, May 2012.
  40. Improved model for shunt admittance in G.fast cable model, Per-Erik Eriksson (EAB), Rob F.M. van den Brink (TNO), ITU-T-SG15 contribution 2012-05-4A-045 to “G.fast”, May 2012.
  41. Proposed change of admittance in current G.fast cable model, Per-Erik Eriksson (EAB), Rob F.M. van den Brink (TNO), ITU-T-SG15 contribution 2012-05-4A-047R1 to “G.fast”, May 2012.
  42. G.fast cyclic-prefix length, Per-Erik Eriksson (EAB), Chenguang Lu (EAB), Aldebaro Klautau (Universidade Federal do Par, Brazil), Igor Almeida (Universidade Federal do Par, Brazil), ITU-T-SG15 contribution 2012-05-4A-053 to “G.fast”, May 2012.
  43. Revised BT Requirements for G.fast, Les Humphrey (BT), ITU-T-SG15 contribution 2012-02-4A-020R1 to “G.fast”, Feb 2012.
  44. Analysis of some service implications of STDMA, Les Humphrey (BT), ITU-T-SG15 contribution 2012-02-4A-021 to “G.fast”, Feb 2012.
  45. Specification of reference loops and wire pair models, Bas van den Heuvel (TNO), ITU-T-SG15 contribution 2012-02-4A-030 to “G.fast”, Feb 2012.
  46. G.fast used for small cell backhaul, Per-Erik Eriksson (EAB), Tomas Thyni (EAB), Tom Starr (AT&T), ITU-T-SG15 contribution 2012-02-4A-035 to “G.fast”, Feb 2012.
  47. On Dynamic Vectoring, L. D. Humphrey (BT), ITU-T-SG15 contribution 2012-02-4A-036 to “G.fast”, Feb 2012.
  48. Dual slope behaviour of EL-FEXT, Rob van den Brink (TNO), ITU-T-SG15 contribution 2012-02-4A-038 to “G.fast”, Feb 2012.
  49. In-traffic reconfiguration of TDD frame structure key parameters, Les Humphrey (BT), ITU-T-SG15 contribution 2012-02-4A-051 to “G.fast”, Feb 2012.
  50. Transmission scheme for G.fast, Vladimir Oksman (Lantiq), Richard Goodson (Lantiq), Tom Starr (AT&T), Charles Cook (CenturyLink), Marko Loeffelholz (Deutsche Telekom), Agustin Badenes (Marvell Semiconductors Inc), Erez Ben Tovim (Sigma Designs), Ravi Mantri (Metanoia Technologies), Martin Kuipers (Nokia-Siemens Networks), Joseph Choghi (Kawasaki Microelectronics), ITU-T-SG15 contribution 2012-02-4A-057 to “G.fast”, Feb 2012.
  51. On the power dissipation of DP Housing, Richard Goodson (ADTRAN), ITU-T-SG15 contribution 2012-02-4A-058R1 to “G.fast”, Feb 2012.
  52. Rate Definitions for G.fast, Richard Goodson (ADTRAN), ITU-T-SG15 contribution 2012-02-4A-059 to “G.fast”, Feb 2012.
  53. STDMA Rate Computations for G.fast, Richard Goodson (ADTRAN), ITU-T-SG15 contribution 2012-02-4A-060 to “G.fast”, Feb 2012.
  54. Extension of STDMA and STDD, Richard Goodson (ADTRAN), ITU-T-SG15 contribution 2012-02-4A-061 to “G.fast”, Feb 2012.
  55. Incoming liaison from BBF (bbf2011.1540) concerning BBF MT WG work on copper models above 30 MHz, Hubert Mariotte (FTO), ITU-T-SG15 contribution 2012-02-4A-062 to “G.fast”, Feb 2012.
2011
  1. Comparison of the attenuation characteristics of some cable models, Bas van den Heuvel (TNO), ITU-T-SG15 contribution 11RV-020 to “G.fast”, November 2011.
  2. Additional reference loops, Bas van den Heuvel (TNO), ITU-T-SG15 contribution 11RV-021 to “G.fast”, November 2011.
  3. Far-end crosstalk in twisted pair cabling; measurements and modelling, Rob van den Brink (TNO), ITU-T-SG15 contribution 11RV-022 to “G.fast”, November 2011.
  4. Enhanced model for FEXT, Rob van den Brink (TNO), ITU-T-SG15 contribution 11RV-023 to “G.fast”, November 2011.
  5. Distribution Point Architectures, Richard Goodson (ADTRAN), ITU-T-SG15 contribution 11RV-028 to “G.fast”, November 2011.
  6. Background Colored Noise measurements, Hubert Mariotte (FTO), ITU-T-SG15 contribution 11RV-031 to “G.fast”, November 2011.
  7. G.fast: Low Power Modes, Les Humphrey (BT), ITU-T-SG15 contribution 11RV-035 to “G.fast”, November 2011.
  8. G. fast: Duplexing Methods, Les Humphrey (BT), ITU-T-SG15 contribution 11RV-038 to “G.fast”, November 2011.
  9. G.fast: Start-up and Initialisation, Les Humphrey (BT), ITU-T-SG15 contribution 11RV-040R1 to “G.fast”, November 2011.
  10. G.fast: Standardisation Roadmap, Les Humphrey (BT), ITU-T-SG15 contribution 11RV-049 to “G.fast”, November 2011.
  11. Equal Length FEXT measurement on PE05 cable, Per-Erik Eriksson (EAB), ITU-T-SG15 contribution 11RV-054R1 to “G.fast”, November 2011.
  12. Proposal related to selection of duplexing scheme for G.fast, Per-Erik Eriksson (EAB), ITU-T-SG15 contribution 11RV-055 to “G.fast”, November 2011.
  13. On the latency, round trip delay and buffering in TDD, Agustín Badenes (Marvell Semiconductor Inc), Khashayar Mirfakhraei (Lantiq), Erez Ben-Tovim (CopperGate Communications), ), ITU-T-SG15 contribution 11RV-058 to “G.fast”, November 2011.
  14. Requirements for G.fast, Richard Goodson (ADTRAN), ITU-T-SG15 contribution 11RV-061 to “G.fast”, November 2011.
  15. Shared Architecture for G.fast, Richard Goodson (ADTRAN), ITU-T-SG15 contribution 11RV-062R2 to “G.fast”, November 2011.
  16. Simulation Results for G.fast, Richard Goodson (ADTRAN), ITU-T-SG15 contribution 11RV-063R1 to “G.fast”, November 2011.
  17. G.fast: Cable Models, Les Humphrey (BT), ITU-T-SG15 contribution 11RV-026R2 to “G.fast”, Oct 2011.
  18. Wideband modelling of twisted pair cables as two-ports, Bas van den Heuvel (TNO), ITU-T-SG15 contribution 11GS3-028 to “G.fast”, September 2011.
  19. Parametric cable models for specifying reference loops, Bas van den Heuvel (TNO), ITU-T-SG15 contribution 11GS3-029 to “G.fast”, September 2011.
  20. Multi-Mode Modems and the Final Drop, Les Humphrey (BT), ITU-T-SG15 contribution 11GS3-063 to “G.fast”, September 2011.
  21. Retransmission, Les Humphrey (BT), ITU-T-SG15 contribution 11GS3-079 to “G.fast”, September 2011.
  22. FAST Protocol Reference Model, Les Humphrey (BT), ITU-T-SG15 contribution 11GS3-080 to “G.fast”, September 2011.
  23. G.fast: Loss characteristics of real in-premises cabling, Trevor Morsman (BT), ITU-T-SG15 contribution 11GS3-081 to “G.fast”, September 2011.
  24. A duplexing method recommendation, Les Humphrey (BT), ITU-T-SG15 contribution 11GS3-083 to “G.fast”, September 2011.
  25. BT requirements for G.fast, Les Humphrey (BT), ITU-T-SG15 contribution 11GS3-087 to “G.fast”, September 2011.
  26. Drop Wire Topologies, Richard Goodson (ADTRAN), ITU-T-SG15 contribution 11BM-022R1 to “G.fast”, June 2011.
  27. Discontinuous Operation, Les Humphrey (BT), ITU-T-SG15 contribution 11BM-035 to “G.fast”, June 2011.
  28. Operator requirements for G.fast, Les Humphrey (BT), ITU-T-SG15 contribution 11BM-064R5 to “G.fast”, June 2011.
  29. G.fast: G.hn as a basis for meeting the emerging G.fast requirements, Erez Ben-Tovim, Rami Verbin (CopperGate Communications), Khashayar Mirfakhraei, JB Kim (Lantiq), Agustín Badenes (Marvell Semiconductor Inc), ITU-T-SG15 contribution 11BM-070 to “G.fast”, June 2011.
  30. Reference Sections and Reference Points for G.fast, John Egan (Marvell Semiconductor Inc.), ITU-T-SG15 contribution 11BM-072 to “G.fast”, June 2011
  31. Proposed Terms and Acronyms Table, John Egan (Marvell Semiconductor Inc), ITU-T-SG15 contribution 11BM-073R1 to “G.fast”, June 2011.
  32. Wireline disturbers and disturbed services, John Egan (Marvell Semiconductor Inc), ITU-T-SG15 contribution 11BM-074 to “G.fast”, June 2011.
  33. Proposal to develop comparison tables between a VDSL2 derivative able to meet the requirements of G.fast and a G.hn derivative able to do the same, John Egan (Marvell Semiconductor Inc), ITU-T-SG15 contribution 11BM-075R1 to “G.fast”, June 2011.
  34. Layer 2 Security for G.fast, John Egan (Marvell Semiconductor Inc), ITU-T-SG15 contribution 11BM-076 to “G.fast”, June 2011.
  35. The need for wideband reference models of loop segments within twisted pair cable topologies, Rob F.M. van den Brink (TNO), ITU-T-SG15 contribution 11BM-020 to "G.fast", April 2011.
  36. G.fast: Wideband transfer and crosstalk measurements on twisted pair cables, Rob F.M. van den Brink (TNO), ITU-T-SG15 contribution 11BM-021 to "G.fast", April 2011.
  37. Draft Common Operator Requirements for G.fast, Les Humphrey (BT), ITU-T-SG15 contribution 11BM-023 to “G.fast”, April 2011.
Search